Due to the needs of ongoing reconstruction, the Terminal has acquired specialized equipment: an equal-wheel excavator-loader TLB 935 with a crab drive, as well as a vibratory trailed roller DU-94.…
Terminal has invested into acquisition of two new trucks with semitrailers, which will be used for cargo transportation within the Terminal’s territory: cargo transportation to a warehouse or to a…
In the end of 2019, the Terminal commenced a considerable roads reconstruction program. Under this program two container freight areas have been constructed, 400 metres of roads have been mend.…
In the spring of 2020, the Terminal completed the construction of two biofuel warehouses, which provide the simultaneous storage capacity of 7 thous. tons of wood pellets. The total covered…
In the second half of 2019 the Terminal acquired the Italian equipment for operating with containers – reach stacker CVS FERRARI F500-RS2, 2019 year of production. During few years the…
The reconstruction of the access road to the port of Ust-Luga has been completed in Leningrad region. According to the press service of the government of Leningrad Region, the work…
The capacity of the stations of the railway junction at the port of Ust-Luga (Leningrad Region) can grow by almost 50% by 2021, Interfax reports with reference to Russian Railways…
The dredging fleet of Northwest basin branch FSUE «Rosmorport» as a part of four vessels has been performing planned repair dredging works in water areas of seaports Ust-Luga and the…
The reconstruction of the entrance to the port of Ust-Luga in the Leningrad Region will be completed in the fall of 2017, the press service of Rosavtodor said. After all…